8-2-41: SEWER SYSTEM MATERIALS AND INSTALLATIONS:
   A.   All sanitary sewer main line and storm drain main line materials, manholes, inlet boxes, French drains, etc., and their installation shall be in accordance with City standard specifications of the construction of sanitary sewers and storm sewers and the applicable standard drawings depicting various sewer line installation details. All sewer system materials shall be of the class, strength, thickness, etc., necessary to accommodate or provide for the depth of cover over the pipe, the type of material and bedding around the pipe, and the type, magnitude, and extent of the external loads being applied to the pipe.
   B.   All sewer service line materials and their installation shall be in accordance with City standard specifications for the construction of sanitary sewers and storm sewers and the applicable standard drawings depicting the various sewer service line installation details.
   C.   All materials must be approved by the City Engineer. (Ord. 543, 5-5-2009; amd. Ord. 2021-621, 9-2-2021)