After approval, as specified in Section 903.01
, a driveway (approach) from the street to the sidewalk shall be constructed as follows:
Topsoil shall be removed; curbs constructed on both sides; base excavated for not less than eleven inches of Number 304 stone; and compacted and paved with not less than two inches of asphalt concrete or six inches of concrete. Paving shall be completed within one year from approval.