After approval, as specified in Section 903.01
, a parking space (pad) shall be constructed as follows:
Topsoil shall be removed; curbs constructed on both sides; base excavated for not less than eleven inches of Number 304 stone; and compacted and paved with not less than two inches of asphalt concrete or six inches of concrete. Paving shall be completed within one year from approval.
(Ord. 95.14. Passed 12-9-85.)