All post-construction storm water runoff control measures including, but not limited to, those required to comply with this chapter shall meet the design criteria, standards and specifications for post- construction storm water runoff control measures similar to or the same as those outlined in the City of Richmond Storm Water Development Manual, Field Office Technical Guide of the USDA Natural Resources Conservation Services and the Indiana Storm Water Quality Manual, published by IDNR, upon availability.
(Prior Code, § 59.1.08) (Ord. 68-2005, passed - -2005)