(A) The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code and applicable district standards.
(B) All such connections shall be made gas-tight and water-tight. Any deviation from the prescribed procedures and materials must be approved by the Director before installation.
(Prior Code, § 50.39)