917.19 CONSTRUCTION PERMIT.
   (a)   Facilities Operators are required to obtain a construction permit prior to commencing any of the following activities:
      (1)   Collocation of small cell equipment on a Wireless Support Structure;
      (2)   Replacement, modification, repair, or maintenance of small cell equipment;
      (3)   Construction, replacement, modification, repair, or maintenance of a Wireless Support Structure associated with a small cell facility; and
      (4)   Any excavation of the Right-of-Way in connection with the activities described in this subsection (a).
   (b)   No construction permit may be issued unless the Facilities Operator has complied with Section 917.15.
   (c)   With respect to the proposed installation of Small Cell Facilities or Wireless Support Structures upon which such Facilities are to be mounted, a Facilities Operator shall utilize a form supplied by the Director of Public Service for such purpose.
(Ord. 24-2019. Passed 4-16-19.)