925.09 FINAL LOCATIONS AND ELEVATIONS.
   (a)    Before acceptance of any sanitary sewer lines as built, a record prepared by a registered professional engineer must be deposited with the Municipal Engineer showing the exact location of all manholes, distance between all manholes, and the invert and top elevations of all manholes, This record shall be submitted to the Director within thirty days after the construction of such sewers has been completed.
   (b)    Failure to provide the locations and elevations shall cause Council to fail to accept such facility for operation and maintenance by the Village.
(Ord. 86-1968. Passed 12-3-68.)