There shall be a permit cost for all property inside and outside of the corporate limits having unmetered fire line and/or sprinkler system connections with the City water system and such charge shall be seventy-five dollars ($75.00) per quarter per line. These costs shall be paid with the quarterly metered water bills and under the same conditions. Installation and inspection shall be made under City supervision.
(Ord. 65-89. Passed 5-22-89.)