A. Except as may be otherwise provided in this chapter, the standards of design and materials and the method of doing the work for any curb, gutter, sidewalk, pavement, ramp, subgrade or drainage facility are as set forth in the subdivision provisions, title 11, chapter 5 of this code.
B. The public works director may in his discretion, permit modifications of the standards mentioned in the preceding subsection to conform with prevailing standards of other improvements in the area of the proposed improvement if he finds that such modifications will not be detrimental to the public interest.
C. The public works director shall have authority to determine and specify:
1. The standards of design, materials and method of doing work for any improvement for which no standard is provided by this section;
2. The location and grades of all improvements;
3. The days or hours and conditions on or under which such work may be done, if necessary to conform to any public work in progress or about to be undertaken, or as may be necessary to prevent any undue interference with traffic or to protect the public safety;
4. Devices and precautions necessary for the protection of the public way, or public improvements or public utilities standing or lying therein, and the safety of the persons using the public way and to prevent any undue interference with traffic thereon.
D. Conformity with the standards, terms and conditions mentioned in this section shall be deemed to be a condition of the permit and part of the agreement mentioned in section 7-5-3 of this chapter. (Ord. 555, 3-2-1976)