Every street excavation shall be refilled as soon as possible after the work is completed and paving, sidewalks and appurtenances shall be replaced in at least as good condition as before the excavation to the satisfaction of the City Administrator or other designated person. All dirt and debris shall be removed immediately. Any person who fails to comply with these requirements within 24 hours after notice from the city shall be liable to the city for the full cost incurred by the city in remedying the defect and restoring the street, sidewalk, alley or public ground it its proper condition. The cost shall be an obligation of the surety on the bond.
(2009 Code, § 301.05) Penalty, see § 10.99