§ 18A.11 BUILDING DESIGN SPECIFICATIONS AND CONSTRUCTION REQUIREMENT FOR ANTICIPATED HANDLING OF SOLID WASTE DISPOSAL.
   The design of any new, substantially remodeled or expanded building or other facility shall provide for proper storage and handling which will accommodate the solid waste loading anticipated and which will allow for efficient and safe waste removal or collection. The design and construction shall conform to the requirements set forth in a document entitled "City of Red Bluff-Trash Enclosure Requirements" on file in the Office of the Building Official.
(Ord. 995, passed 1-6-2009)