1044.12 PROGRAM REQUIREMENTS.
   (a)   The Wastewater Treatment Plant Superintendent, or an authorized representative as appointed by the Mayor, shall administer the SSDCP. The Director of Public Service, Utilities Director and the City Engineer shall assist the Wastewater Treatment Plant Superintendent with this program.
   (b)   The SSDCP shall be implemented through the issuance of satellite community discharge permits. The permits shall delineate, among other things, the elimination, up to the specified storm event design, of sanitary sewer overflows (SSOs), installation of flow meters, implementation of Sanitary Sewer Evaluation Survey (SEES) and Best Management Practices (BMP).
   (c)   Each satellite community shall, as a condition of its Permit, be required to undertake appropriate best management practices for control/operation of their sanitary sewer system.
   (d)   Each satellite community shall identify and disclose to the City as soon as it becomes known all sanitary sewer or combined sewer overflow points or which become known to the satellite community that are not included in the satellite community's permit.    
   (e)   The satellite community shall be solely responsible for projects set forth in its community compliance schedule identified in its satellite community discharge permit.    
   (f)   No New Sanitary Sewer or Combined Sewer Overflows. No satellite community overflows shall exist except those that are controlled in accordance with the satellite community discharge permit.
   (g)   Each satellite community shall maintain and provide annually to the City a current map of all sanitary sewers and combined sewers tributary to the City, including all possible overflow points.
(Ord. 2014-164. Passed 10-6-14.)