§ 155.31 LIQUID WASTE MANAGEMENT PLAN.
   (A)   Requirements for community liquid waste system.
      (1)   Design and construction of the community system, by the time required in the approved plan, shall be in compliance with all applicable Water Quality Control Commission Regulations in effect at the time of final plat approval.
      (2)   Connection to the community system for the occupants within the subdivision in accordance with the requirements of the approved plan.
      (3)   Provisions for the operation, maintenance, and expansion of the community system to meet the growth in population of the subdivision in a manner consistent with the approved plan and consistent with all applicable Water Quality Control Commission Regulations in effect at the time of final plat approval.
   (B)   Submittals for community liquid waste system.
      (1)   A map showing easements and rights-of-way necessary for the installation of the community liquid waste treatment system;
      (2)   Preliminary plans and specifications, prepared by a professional engineer registered in New Mexico, for the construction of the system;
      (3)   The time when the community system is to be completed;
      (4)   If the proposal is to connect to an existing community liquid waste system, the ability of that system to handle the additional load must be demonstrated;
      (5)   The projected population of the subdivision;
      (6)   Methods to comply with the water quality requirements of these subdivision regulations; and
      (7)   A subdivision improvements agreement which guarantees:
         (a)   The construction and operation of any liquid waste treatment system required as shown in the final plat documents and plans;
         (b)   Certification of the operator of the system; and
         (c)   Involvement as prescribed in the final plat documents of a homeowners association or community association.
(1981 Code, App. B) (Ord. 625, App. B, passed 2-25-1975) Penalty, see § 155.99