Backfilling shall be completed by placing the backfill material well up over the top of the trench. For dry backfilling, the material shall be compacted with a roller of an approved type, or with the rear of a truck carrying at least 5 tons, until the surface is unyielding. The surface shall then be graded as required.
(1981 Code, § 24-95) Penalty, see § 93.999