13-5-11: REQUIREMENT TO SUBMIT NEW TECHNICAL DATA:
   A.   For all development proposals that impact floodway delineations or base flood elevations, the community shall ensure that technical data reflecting such changes be submitted to FEMA within six (6) months of the date such information becomes available. These development proposals include:
      1.   Floodway encroachments that increase or decrease base flood elevations or alter floodway boundaries;
      2.   Fill sites to be used for the placement of proposed structures where the applicant desires to remove the site from the special flood hazard area;
      3.   Alteration of watercourses that result in a relocation or elimination of the special flood hazard area, including the placement of culverts;
      4.   Subdivision or large scale development proposals requiring establishment of base flood elevations according to subsection 13-5-1C of this chapter.
   B.   It is the responsibility of the applicant to have technical data prepared in a format required for a conditional letter of map revision or letter of map revision and submitted to FEMA. Submittal and processing fees for these map revisions shall be the responsibility of the applicant. (Ord. 513, 4-13-2010, eff. 5-3-2010)