§ 52.08 INSTALLATION PROCEDURE.
   (A)   Upon approval of the customer’s application, the customer shall be responsible for actual installation from the city main to the premises to be served.
   (B)   The building sewer shall be cast iron soil pipe, vitrified clay sewer pipe, or other suitable material approved by the Sewer Commissioner. Joints shall be tight and waterproof. Any part of the building sewer that is located within ten feet of a water service pipe shall be constructed of cast iron soil pipe with leaded joints. Cast iron pipe with leaded joints may be required by the Sewer Commissioner where the building sewer is exposed to damage by tree roots. If installed in filled or unstable ground, the building sewer shall be of cast iron soil pipe, except that non-metallic material may be accepted if laid on a suitable concrete bed or cradle as approved by the Sewer Commissioner.
   (C)   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
   (D)   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer.
   (E)   All excavations required for the installation of a building sewer shall be open trench work, unless otherwise approved by the Sewer Commissioner.
   (F)   All joints and connections shall be made gastight and watertight.
   (G)   No person shall make connection of roof downspouts, interior and exterior foundation drains, areaway drains, or other sources of surface runoff or groundwater to a building sewer or building drain, which in turn, is connected directly or indirectly to a public sanitary sewer.
   (H)   The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city or the procedures set forth in appropriate specifications of the A.S.T.M. and the S.P.C.F. Manual of Practice No. 9. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the Sewer Commissioner before installation.
   (I)   In making excavations in streets, alleys, or sidewalks for the purpose of installing pipe or making repairs, the paving, stones, and earth must be removed and deposited in a manner that will occasion the least inconvenience to the public and provide for adequate drainage. No person shall have an excavation made in the street, alley, or sidewalk open at any time without a barricade and, during the night, warning lights. After the house sewer is laid, the public ways and property shall be restored to good condition. If the excavation in the public ways and property is left open or unfinished for a period of 24 hours or more, the Sewer Commissioner shall have the duty to finish or correct the work and all expense so incurred shall be charged to the owner, occupant, or lessee of the property. All installations or repairs of pipes require two inspections by the Sewer Commissioner. The first inspection shall be made when connections or repairs are complete and before the pipes are covered. The second inspection shall be made after the dirt work is completed and the service restored. It is the customer’s responsibility to notify the Sewer Commissioner at the time the work is ready for each inspection. All installation shall be done under the supervision and strictly in accordance with the rules, regulations, and specifications for such installation prescribed by the Sewer Commissioner; provided, that the said rules, regulations, and specifications have been reviewed and approved by the governing body.
(Prior Code, § 3-208) Penalty, see § 10.99