§ 51.161 HAULED WASTES.
   (A)   Hauled waste may be introduced into the POTW only at a designated receiving structure within the treatment plant area, and at such times as are established by the Director of Utilities. Such wastes shall not violate this section or any other requirements established or adopted by the city. Wastewater discharge permits for individual vehicles to use such facilities shall be issued by the Director of Utilities.
   (B)   Hauled waste haulers may only discharge loads at locations specifically designated by the Director of Utilities. No load may be discharged without prior consent of the Director of Utilities. The
Director of Utilities may collect samples of each hauled load to ensure compliance with applicable pretreatment standards. The Director of Utilities may require the hauler to provide a waste analysis of any load prior to discharge.
   (C)   Hauled waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the waste hauler, permit number, truck identification, sources of waste, and volume and characteristics of waste.
   (D)   Fees for dumping hauled wastes will be established.
(Ord. 9399, passed 2-24-2020)