§ 162.213 PLOT DIAGRAM.
   There shall also be filed a plot diagram in a form and size suitable for filing permanently with the permit record, drawn to scale, with all dimensions figured, showing accurately the size and exact location of all proposed new construction, or in the case of demolition, of the construction as is to be demolished, and of all existing buildings and structures that are to remain.
(1980 Code, § 29.1104) (Ord. 9125, passed 4-21-2008) Penalty, see § 162.999