§ 52.65 REPORTING REQUIREMENTS.
   (A)   A verified report shall be filed annually by all users with industrial wastewater discharge permits. Those users seeking renewal of an industrial wastewater discharge permit shall file said report with the application for renewal.
   (B)   The report shall include, at a minimum, the following:
      (1)   The results of the test of quantity, using measuring equipment as required by this chapter; and
      (2)   A statement as to whether or not the applicant has made any changes in its operations that has or will, within the terms of the permit, increase the strength, volume or any other characteristic of the applicant’s discharge into the sanitary sewer system.
   (C)   If the applicant has made changes in its operations that have or will increase, during the term of the permit, the strength, volume or any other characteristics of the user’s discharge into the sewer system, then:
      (1)   The applicant shall describe the changes in operation that alter the strength, volume or any other characteristics of the discharge.
      (2)   The applicant shall, if the Department so requires, submit an analysis complete with standard methods and conducted in accordance with this section.
   (D)   It shall be prohibited for a permit holder to change its industrial process without approval of the Department if such change results in the user exceeding the levels for flow and discharge quality stated in the user’s permit.
(Prior Code, § 16-2-3)