PUBLIC SEWER SYSTEM EXTENSIONS
(A) Gravity public sewers shall be eight inches in diameter, or larger, to be accepted as part of the town’s wastewater collection system, except as provided in division (B) below.
(B) Six-inch diameter public sewers will be accepted as part of the town’s wastewater collection system when:
(1) The sewer serves only a small restricted area and is designed so that it cannot be extended to serve any additional area;
(2) The service does not exceed 250 feet in length; or
(3) A manhole is located at the upstream terminus of the sewer.
(C) The minimum size of a service lateral connecting to a public sewer shall be four inches in diameter.
(Prior Code, § 16-1-5) (Ord. 91-02, passed - -1991; Ord. 91-04, passed - -1991; Res. 91-09, passed - -1991; Ord. 92-04, passed - -1992; Res. 92-04, passed - -1992; Res. 94-22, passed - -1994; Ord. 00-04, passed - -2000; Ord. 10-01, passed - -2010)
(A) The design and engineering of all public sewers shall be in conformance with the Town of Quartzsite’s Standard Specifications for Utility Installations.
(B) All public sewers must be of a size to provide adequate capacity to service a specific designated area.
(C) Construction drawings for such public sewers shall be certified by a registered engineer and shall be submitted to the Town Engineer for approval.
(D) A letter of acknowledgment shall be submitted by the developer concurrently with the submittal of proposed project design drawings. Included in the letter will be:
(1) Identification of the proposed project;
(2) Identification of the project developer; and
(3) Acknowledgment of the project developer that:
(a) The developer shall cause his or her professional engineer to submit all documents, required by the state’s Department of Environmental Quality (ADEQ) Engineering Bulletin No. 10, as applicable, to the ADHS for review and approval and to obtain all permits required to facilitate completion of the proposed project;
(b) The developer shall contract a professional engineer to provide detailed construction inspection services for the proposed project. Upon completion of the project, the developer’s engineer shall complete the ADEQ “approval of construction” documentation. Concurrently, the developer’s engineer shall forward a copy of same, including one set of Mylar, reproducible as-built drawings, affixed with the developer’s engineer’s seal, and one electronic file to the town’s Department of Public Utilities and Town Engineer for review and approval; and
(c) Upon issuance of the approval of construction by ADEQ final acceptance of the facility will be acknowledged by the town and the one-year warranty period shall commence.
(Prior Code, § 16-1-5) (Ord. 91-02, passed - -1991; Ord. 91-04, passed - -1991; Res. 91-09, passed - -1991; Ord. 92-04, passed - -1992; Res. 92-04, passed - -1992; Res. 94-22, passed - -1994; Ord. 00-04, passed - -2000; Ord. 10-01, passed - -2010)