§ 50.67 COST OF CONSTRUCTION.
   The cost of construction of a line extension shall include in addition to the actual material and installation costs of piping, valves and other appurtenances, the engineering costs for preparation of plans and specifications and costs of inspection and staking. The cost of water service connections shall not be included in the cost of construction of the water line extension for reimbursement purposes.
(Prior Code, § 17-1-6) (Ord. 96-03, passed - -1996; Res. 96-01, passed - -1996; Ord. 00-05, passed - -2000; Ord. 10-02, passed - -2010)