§ 50.06 RENEWAL OF PERMITS.
   (A)   Complete applications for renewal of permits must be submitted at least 30 days prior to the expiration date of the expiring permit.
   (B)   Evaluation of an operating permit renewal application will be based on the quality of operation during the period of the previous permit. If the standards specified in this subchapter have been met, the permit will be reissued.
      (1)   Evaluation will be based on reports of all inspections made during the evaluation period, with a minimum of eight inspections. No permit shall be renewed if the facility holding that permit has not been substantially in compliance with this subchapter.
      (2)   No permit shall be renewed if, on more than half of the inspections, the operation did not meet requirements of this regulation, or if on more than one occasion one of the following had occurred:
         (a)   Acceptance of hazardous wastes, except as set out in the subchapter;
         (b)   Open burning of refuse without efforts to extinguish the fire having been initiated prior to the inspection; or
         (c)   Leachate flowing into a stream, lake, river, other surface water or an aquifer without adequate control measures in operation.
(Ord. 1992-9-8, passed 9-8-1992)