§ 93.03 REQUIREMENTS FOR INSTALLATION.
   Any installations contemplated herein must meet the following standards.
   (A)   The tile or culvert to be installed by applicant shall be either corrugated metal pipe, helical aluminum or vitrified clay tile for the entire right-of-way, except that plastic tile may be used under driveways and in side ditches along roads.
   (B)   Such tile or culvert shall be the same size as any tile or culvert being used downstream from the installation.
(1983 Code, Ch. 101, § 6-101-3) (Ord. 1989-19, passed 6-19-1989)