1044.04 CONNECTIONS; APPROVAL; SPECIFICATIONS.
   No new connections or alterations to existing connections shall be made to any of the sewer systems of the Village of Put-in-Bay without prior permission of the Village Council or its authorized representative, nor shall the Village allow any new connections unless there is sufficient downstream sewer capacity and sufficient treatment capacity. All sewer connections, whether new, repaired or replaced, shall be constructed of materials and techniques approved by the Village. All new connections shall be six-inch sanitary sewer pipe (or larger if flows require), with the sanitary sewer materials meeting the following standards:
Pipe            Material Specifications   Joint Specifications
ABS (8 inch and over)   ASTM D2680         ASTM D2680
ABS (4 inch and 6 inch)   ASTM D2661         ASTM D2661
Asbestos cement      ASTM C428         ASTM D1869
Asbestos cement      ASTM C644         ASTM D1869
Cast iron         AWWA C106         AWWA C111
Clay            ASTM C700         ASTM C425
PVC            ASTM C3034          ASTM D3212
PVC            ASTM C3033          ASTM D3212
(Ord. 449. Passed 4-4-83.)