All utility lines, including but not limited to gas, electric power, telephone and CATV cables shall be located underground throughout the subdivision. Wherever existing lines are located above ground, except on public roads and right-of-ways, they shall be removed and placed underground. All utility lines and other facilities existing and proposed throughout the subdivision shall be shown on the preliminary plat or sketch plan in the case of a minor subdivision. Underground service connections to the street property line of each platted lot shall be installed at the subdivider's expense. At the discretion of the Commission, the requirement for service connections to each lot may be waived in the case of adjoining lots to be retained in single ownership intended to be developed for the same primary use.
(Ord. 174, § 416, passed 6-11-90) Penalty, see § 153.999