17.08.060: IMPROVEMENTS; REQUIRED FACILITIES:
After the subdivider's preliminary plan has been approved, he shall construct the improvements as described in this section and section 17.08.070 of this chapter, under the direction of the city, as hereinafter specified:
   A.   Markers: All subdivision boundary corners, all points tangent, and street intersections shall be definitely marked with an approved type of metal peg.
   B.   Street Improvements: The subdivider shall grade, gravel and surface all streets within his subdivision in accordance with the city specifications, except in the case of arterial streets requiring a right of way width of more than sixty feet (60'). In the case of arterial streets requiring a right of way width of over sixty feet (60'), the city will pay one-half (1/2) of the cost of bringing such streets to grade. The graveling shall be done at the expense of the subdivider. All materials and workmanship shall be in accordance with city specifications.
   C.   Water Mains: The subdivider shall install water mains in accordance with city specifications. Sizes of water mains shall be determined by the city, and shall be based upon fire protection requirements.
   D.   Fire Hydrants: Fire hydrants shall be installed at intervals within the subdivision in such a manner that no house will be a distance greater than five hundred feet (500') from the closest hydrant.
   E.   Sewer Mains: Sanitary sewer mains shall be installed within the subdivision in accordance with city specifications. All sewer mains shall be at least eight inches (8") in diameter.
   F.   Other Utilities: Such other utilities shall be installed as the city may require. (Prior code § 12-4-3; amd. Ord. 1244-74, 1974)