The following guidelines shall be applied in the subdivision and construction of land areas.
(A) The development shall conform to the natural limitations presented by topography and soil so as to create the least potential for soil erosion.
(B) Erosion and siltation control measures shall be coordinated with the different stages of development. Appropriate control measure shall be installed prior to development when necessary to control erosion.
(C) Land shall be developed in increments of workable size such that adequate erosion and siltation controls can be provided as construction progresses. The smallest practical area of land shall be exposed at any one period of time.
(D) When soil is exposed, the exposure shall be for the shortest feasible period of time.
(E) Where the topsoil is removed, sufficient arable soil shall be set aside for respreading over the developed area. The soil shall be restored to a depth of four inches, and shall be of a quality at least equal to the soil quality prior to development.
(Ord. 217, passed 11-28-1994) Penalty, see § 10.99