Unless specifically defined below, words or phrase used in this Chapter shall be interpreted so as to give them the meanings they have in common usage and to give this Chapter its most reasonable application:
AREA OF SPECIAL FLOOD HAZARD: The land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year. Designation on maps always includes the letters A or V.
BASE FLOOD: The flood having a one percent (1%) chance of being equalled or exceeded in any given year; also referred to as the "100-year flood". Designation on maps always includes the letters A or V.
DEVELOPMENT: Any manmade changes to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations located within the area of special flood hazard.
FLOOD INSURANCE RATE MAP (FIRM): The official map on which the Federal Insurance Administration has delineated both the areas of special flood hazard and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY: The official report provided by the Federal Insurance Administration that includes flood profiles, the Flood Boundary - Floodway Rate Map, and Community Panel No. 160109 0001C.
FLOOD OR FLOODING: A general and temporary condition of partial or complete inundation of normally dry land areas from:
A. The overflow of inland or tidal waters; and/or
B. The unusual and rapid accumulation of runoff of surface waters from any source.
FLOODWAY: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot (1').
LOWEST FLOOR: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage, in an area other than a basement area, is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of this Chapter found at subsection 9-1-6B1b of this Chapter.
MANUFACTURED HOME: A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than one hundred eighty (180) consecutive days. For insurance purposes, the term "manufactured home" does not include park trailers, travel trailers, and other similar vehicles.
NEW CONSTRUCTION: Structures for which the "start of construction" commenced on or after the effective date hereof.
START OF CONSTRUCTION: Includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundation or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.
STRUCTURE: A walled and roofed building including a gas or liquid storage tank that is principally above ground.
SUBSTANTIAL IMPROVEMENT: Any repair, reconstruction or improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure either:
A. Before the improvement or repair is started, or
B. If the structure has been damaged and is being restored, before the damage occurred. For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. (Ord. 87-03, 6-22-1987)