936.04 STORM WATER POLLUTION PREVENTION PLAN.
   The applicant shall submit a Storm Water Pollution Prevention Plan (SWP3) consistent with the requirements set forth in the most recent Ohio EPA NPDES General Construction Permit. For specific requirements of a SWP3 the designer shall refer to SWP3 Check List. The SWP3 must address erosion and sediment control during construction as well as post construction water quality practices. Post construction practices must meet the requirements of the most recent Ohio EPA General Construction Stormwater Permit. The SWP3 shall incorporate measures as recommended by the most current edition of Rainwater and Land Development Manual as published by the Ohio Department of Natural Resources.
(Ord. 2014-26. Passed 6-23-14.)