Where openings have been or are to be made in a street, the City Engineer shall provide for the restoration of the street pavement in one of the following ways:
(a) The entire work of restoration, including both paving surface and paving base, may be performed directly by the department in charge of street repairs, after the permittee has completed the backfill.
(b) The paving surface may be installed by the department in charge of street repair after the permittee has made the backfill and installed the pavement base.
(c) The work may be done either completely as in subsection (a), or as to paving surface only, as in subsection (b), by a City contractor hereunto duly authorized by contract with the City.
(d) The entire work of restoration may be done by the permittee.
In all cases the entire work shall be carried out under the direction and to the satisfaction of the City Engineer, and in accordance with the rules, regulations and specifications approved by the City Manager.
(Ord. 2016-166. Passed 11-28-16.)