The city hereby adopts the following fee schedule for the services provided for herein:
Total Valuation | Fee |
Total Valuation | Fee | |
Building: | $1,000 and less Over $1,000 | $60 plus $10 for each thousand |
Area (sq. ft.) Alternative Method | ||
New residential occupied space New residential un-occupied space New commercial occupied space New commercial un-occupied space | $0.65 per sq. ft. $0.45 per sq. ft. $0.85 per sq. ft. $0.55 per sq. ft. | |
New construction: Residential or Commercial (Fee + $75 inspection fee) | ||
Accessory/storage building | $100 | |
Plan Review: | For one and two-family residential structures For other structures | 25% of permit fee 50% of permit fee |
Driveways: | New/repair residential driveway Repair commercial driveway/parking lot $1,000 and less Over $1,000 | $75 $100 plus $20 per household |
Electrical: | Permit issuance fee Temporary pole New meter loop Working clearance (when requested) Reconnect meter service: For 1-20 circuits For each circuit over 20, per circuit | $75 $50 $50 $50 $40 $50 $3 |
Plumbing: | Permit issuance fee For each fixture, floor drain or trap For each house sewer For each grease trap For vacuum breakers or backflow protective devices, one to five Water heater | $75 plus $5 $50 $100 $40 $35 |
Sprinkler: | Residential lawn Commercial lawn | $75 plus $150 |
Gas: | Permit issuance fee For one to five outlets For each additional outlet | $75 plus $25 $5 |
Mechanical: | Permit issuance fee For the first $1,000 of evaluation For each additional $1,000 or fraction thereof | $75 plus $20 $5 |
Signs: | $1,000 and less Over $1,000 | $75 plus $20 per thousand |
Swimming Pool: | Private pool Public/commercial pool | $200 $400 |
Fence: | New/repair | $50 |
Energy Conservation Inspection: | For residential buildings For commercial buildings | Based on 3rd party inspectors fees + administration fee |
House Moving Fee: | $200 | |
Demolition: | $200 | |
Curb Break: | $50 | |
Certificate of Occupancy: | $100 | |
Home Occupation Fee: (Annually) | $50 | |
Re-Inspection Fee: (Per Inspection) | $75 | |
Contractors: | General Construction Contractor initial registration Continuing registration (annually) For other Contractors, initial fee Continuing registration (annually) | $100 $50 $50 $25 |
All contractors shall provide proof of an acceptable General Liability Insurance or a good and sufficient “Licenses and Permit Bond” in the sum of $10,000. | ||
Planning and Zoning: | $200 | |
Board of Adjustments: | $200 | |
Plats: | Preliminary Plats per plat per lot Final Plats per plat per lot For each multi-family, commercial or industrial area not subdivided into lots, both Preliminary and Final plats shall be: - Per acre per plat - Plus engineering fees and any other additional expenses For HUD Code Manufactured Home and Recreational Vehicle Parks: | $500 $10 $950 $15 $600 Preliminary plats per acre: $600 Final plats per acre: $900 |
(Ord. 673, passed 2-12-2008; Res. 11-10-2015-02, passed 11-10-2015; Ord. 673-A, passed 11-10- 2015; Ord. 673-B, passed 12-12-2017; Ord. 673-D, passed 6-13-2023)
Cross-reference:
Fire prevention, see Chapter 96