§ 150.06 PERMIT, PLAN REVIEW AND INSPECTION FEE SCHEDULE.
   The city hereby adopts the following fee schedule for the services provided for herein:
Total Valuation
Fee
Total Valuation
Fee
Building:
$1,000 and less
Over $1,000
$60 plus
$10 for each thousand
Area (sq. ft.) Alternative Method
New residential occupied space
New residential un-occupied space
New commercial occupied space
New commercial un-occupied space
$0.65 per sq. ft.
$0.45 per sq. ft.
$0.85 per sq. ft.
$0.55 per sq. ft.
New construction:
Residential or Commercial (Fee + $75 inspection fee)
 
Accessory/storage building
$100
Plan Review:
For one and two-family    
   residential structures
For other structures
25% of permit fee
50% of permit fee
Driveways:
New/repair residential
   driveway
Repair commercial
   driveway/parking lot
      $1,000 and less
      Over $1,000
$75
$100 plus
$20 per household
Electrical:
Permit issuance fee
Temporary pole
New meter loop
Working clearance
   (when requested)
Reconnect meter service:
   For 1-20 circuits
   For each circuit over 20, per circuit
$75
$50
$50
$50
$40
$50
$3
Plumbing:
Permit issuance fee
For each fixture, floor drain or
   trap
For each house sewer
For each grease trap
For vacuum breakers or backflow protective devices, one to five
Water heater
$75 plus
$5
$50
$100
$40
$35
Sprinkler:
Residential lawn
Commercial lawn
$75 plus
$150
Gas:
Permit issuance fee
For one to five outlets
For each additional outlet
$75 plus
$25
$5
Mechanical:
Permit issuance fee
For the first $1,000 of evaluation
For each additional $1,000 or fraction thereof
$75 plus
$20
$5
Signs:
$1,000 and less
Over $1,000
$75 plus
$20 per thousand
Swimming Pool:
Private pool
Public/commercial pool
$200
$400
Fence:
New/repair
$50
Energy Conservation Inspection:
For residential buildings
For commercial buildings
Based on 3rd party inspectors fees + administration fee
House Moving Fee:
 
$200
Demolition:
 
$200
Curb Break:
 
$50
Certificate of Occupancy:
 
$100
Home Occupation Fee:
(Annually)
 
$50
Re-Inspection Fee:
(Per Inspection)
 
$75
Contractors:
General Construction
   Contractor initial registration
Continuing registration
   (annually)
For other Contractors, initial
   fee
Continuing registration
   (annually)
$100
$50
$50
$25
All contractors shall provide proof of an acceptable General Liability Insurance or a good and sufficient “Licenses and Permit Bond” in the sum of $10,000.
Planning and Zoning:
 
$200
Board of Adjustments:
 
$200
Plats:
Preliminary Plats   per plat
         per lot
Final Plats       per plat
         per lot
For each multi-family,
   commercial or industrial area not subdivided into lots, both Preliminary and Final plats shall be:
   - Per acre per plat
   - Plus engineering fees and
      any other additional expenses
For HUD Code Manufactured
   Home and Recreational Vehicle Parks:
$500
$10
$950
$15
$600
Preliminary plats per acre: $600
Final plats per acre: $900
 
(Ord. 673, passed 2-12-2008; Res. 11-10-2015-02, passed 11-10-2015; Ord. 673-A, passed 11-10- 2015; Ord. 673-B, passed 12-12-2017; Ord. 673-D, passed 6-13-2023)
Cross-reference:
   Fire prevention, see Chapter 96