§ 101.45 EMERGENCY SITUATIONS.
   The requirements as mentioned above are to be used for all planned construction projects. In the event of an emergency type situation, notification of work to be done can be made by telephone directly to the responsible person or his or her appointed representative, thereby, bypassing the requirements mentioned above. Under these conditions the contractor or agency will still be required to follow the basic barricading standards as outlined in the attached Manual.
(Ord. 111A, passed - -)