In addition to the other stipulations set forth in these regulations, the following shall be required of subdivisions within the delineated flood hazard areas:
(a) The Floodway and Flood Boundary areas shall be clearly labeled on the final plat.
(b) Building site shall not be permitted in the Floodway area. They may be permitted in the Flood Boundary area if the sites are filled or if the lowest floor of the structure is elevated above the one hundred (100) year flood elevation of the area. The one hundred (100) year flood elevation will be stated on the final plats.
(c) Fill areas shall extend beyond the limits of the intended building site and shall include areas for proper drainage and slope.
(d) The Safety Service Director or their designee shall determine the street elevations in flood hazard areas and state what drainage systems will be required for the subdivision.