(a) Water mains shall be laid wherever possible in the planting strip as near to the edge of the road right-of-way as possible. Minimum cover shall be four (4) feet.
(b) All water mains shall be constructed according to the current standards and specifications established by the Ohio Environmental Protection Agency.
(c) All plans, specifications, and construction of water mains shall be approved by the Water Department.