12-4-11: STORM SEWERS AND DRAINAGE:
   A.   Minimize Flood Damage: All subdivision proposals and other proposed new developments shall be reviewed by the engineering department to ensure that all such proposals are consistent with the need to minimize flood damage; that all public utilities and facilities such as sewer, gas, electrical and water systems are located, elevated and constructed so as to minimize or eliminate flood damage; and that adequate drainage is provided so as to reduce exposure to flood hazards.
   B.   Standards And Specifications: Storm sewers and drainage facilities shall be provided and constructed in compliance with the standards and specifications outlined in appendix A attached to ordinance 5157 on file in the office of the city clerk. (Ord. 5157, 8-10-1981)