§ 54.08 CITY RESPONSIBILITY.
   (A)   The city will operate a cross-connection control program, to include the keeping of necessary records, which fulfills the requirements of this chapter, and is consistent with American Water Works Association (AWWA) Manual of Water Supply Practices, —14, most current edition, and the requirements of Florida Administrative Code 62-555 and 62-610.
   (B)   No reclaimed water service connection shall be installed on the premises of any customer unless the city potable water system is protected as required by this chapter.
   (C)   The city will not allow any cross-connection between the reclaimed water system and the potable water system.
   (D)   The city shall ensure that all permitted and testable approved backflow preventers are tested and repaired at least once per year. This testing shall be performed by a certified backflow tester and a report provided to the city at the customer’s expense. The city shall ensure that all city-owned residential dual check prevention devices are replaced according to state requirements.
(Ord. 2002-65, passed 9-10-02; Am. Ord. 2005-62, passed 6-28-05; Am. Ord. 2011-59, passed 7-12-11)