15.24.050: EXCEPTIONS AND ADDITIONS TO THE INTERNATIONAL MECHANICAL CODE AND INTERNATIONAL FUEL GAS CODE:
   A.   IFGC section 303 Appliance Location/subsection 303.3 Prohibited Locations: Exceptions 3 and 4 shall be deleted.
   B.   IFGC section 403 Piping Materials/subsection 403.4.2 Steel: Shall be amended so as to prohibit the use of galvanized piping in any gas piping system.
   C.   IFGC section 403 Piping Materials/subsection 403.4.3 Copper And Brass: The entire subsection shall be deleted.
   D.   IFGC section 403 Piping Materials/subsection 403.5.2 Copper Tubing: This subsection shall be deleted entirely.
   E.   IFGC section 621 Unvented Room Heaters: This section shall be deleted entirely.
   F.   IMC section 101 General/subsection 101.2: Exception 1 shall be deleted entirely.
   G.   Installation, use, and maintenance of liquefied petroleum gas (LPG) utilization equipment is prohibited within basements as defined in the IBC and IRC and in pits or any other below grade locations.
   H.   Unvented appliances are prohibited unless the building official has inspected the appliance, its location and installation, and specifically granted approval for said appliance.
   I.   Inspections in addition to requirements listed in the international mechanical code and the international fuel gas code shall follow the following procedures:
      1.   Piping inspection, to be made after all piping and venting authorized by the permit has been installed, and after the permit holder has assured himself that the system will meet the tests, but before any such piping has been covered or concealed and before any gas appliance has been attached thereto, at which time the following pressure tests will be conducted by the permit holder in the presence of the inspector:
         a.   Under fourteen inches (14") WC delivery pressure: A twenty (20) pound test for a minimum of twenty (20) minutes with a thirty (30) pound pressure gauge.
         b.   Over fourteen inches (14") WC delivery pressure: A sixty (60) pound test for a minimum of thirty (30) minutes with a one hundred (100) pound pressure gauge.
      2.   Final inspection, to be made after all piping and venting is completed and all appliances authorized by the permit have been placed and connected and before gas is admitted to the system.
(Ord. 2831 § 6, 2008: Ord. 2759, 2005)