§ 54.020  SAMPLING AND MONITORING FACILITIES MAY BE REQUIRED.
   The YCUA shall, when determined necessary by the Director, require to be provided and operated at the user’s own expense, monitoring facilities to allow inspection, sampling and flow measurement of the building sewer and/or internal drainage systems. The facility, sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with plans and specifications submitted to and approved by the YCUA and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the YCUA.
(Prior Code, § X-3.48)