When work performed by a utility or contractor under this Part is found in violation of same the contractor or utility may be given the opportunity to make corrections as required by the Township. If the corrections are not completed in the specified time or not completed as specified, the Township may suspend all work whether completed or in progress in noncompliance with this Part, and take appropriate safety precautions. All work performed or contracted for by Plains Township to attain compliance in this regard shall be billed to the utility or contractor. In addition, a penalty for noncompliance shall be imposed. (See Fee Schedule.)
(Ord. 8/24/1988, § 403)