§ 11.2C REVIEW OF IMPROVEMENT LOCATION PERMIT APPLICATION.
      (1)   Improvement location permits for single-family and two-family dwellings and related accessory buildings or structures. The Director may take up to five business days to study an application for an improvement location permit. During such five-business day period, the Director may consult with the Technical Advisory Committee or other appropriate technical consultants. If, after such five-day period, the Director has not requested any additional information or stated any objections in writing to the applicant, and the proposed building, structure or improvement, and the proposed use conform in all respects to the provisions of this ordinance, the Director shall issue the improvement location permit.
      (2)   Improvement location permits for all: multi-family, commercial, industrial or special exception buildings, structures, improvements or uses; signs; and accessory buildings, structures or improvements related to multi-family, commercial, industrial or special exception uses. The Director may take an additional ten business days, beyond the review period specified above, in which to study the application, during which time the Director may consult with the Technical Advisory Committee or other appropriate technical consultants. If, after such additional ten-day period, the Director has not requested any additional information or stated any objections in writing to the applicant, and the proposed building, structure, improvement or sign, and the proposed use conform in all respects to the provisions of this ordinance, the Director shall issue the improvement location permit.
      (3)   Improvement location permit for all multi-family, commercial, industrial or special exception buildings, structures, improvements or uses. An application for an improvement location permit for any multi-family, commercial, industrial or special exception building, structure, improvement or use shall be certified by a registered professional engineer or architect verifying that the building, structure, improvement or use intended will be in compliance with all applicable use regulations, development standards and performance standards of the district in which the building, structure, improvement or use is to be located.
      (4)   Improvement location permits for buildings, structures, improvements, signs or uses authorized by special exception or variance. In addition to the requirements above, an improvement location permit for a building, structure, improvement, sign or use authorized by special exception or variance shall not be issued until:
         (a)   Receipt by the Director of written notice from the Board that the application therefore has been approved by the Board; and
         (b)   A determination by the Director that said improvement location permit application is in full compliance with the terms of any conditions which may have been imposed by the Board and commitments which may have been made by the owner.
(Ord. 21-97, passed - -1997)