§ 2.13B DEVELOPMENT STANDARDS.
      (1)   Minimum lot width and frontage. Each lot, integrated center or industrial park shall have a minimum of 100 feet on a public street.
      (2)   Minimum yards and minimum building setbacks.
         (a)   Front. A minimum front yard and minimum building setback measured from the proposed right-of-way shall be provided as follows:
 
Collector street
60 ft.
Interstate street
60 ft.
Local street/cul-de-sac street
30 ft.
Primary arterial street
120 ft.
Secondary arterial street
90 ft.
 
         (b)   Minimum side yard and setback. Shall be provided from the lot line as follows:
 
Minimum side bufferyard
50 ft.
Minimum side yard
10 ft.
 
         (c)   Minimum rear yard and setback. Shall be provided from the lot line as follows:
 
Minimum rear bufferyard
50 ft.
Minimum rear yard
10 ft.
 
      (3)   Use of minimum yards and bufferyards. All minimum yards and bufferyards shall be landscaped with grass, trees, shrubbery or hedge, or in combination with other suitable ground cover materials and shall remain free from structures except where expressly permitted below:
         (a)   Minimum front yards and minimum front bufferyards. May include driveways and shall be maintained as open space free from buildings or structures in compliance with the requirements for perimeter landscape yards as set forth in Article IV;
         (b)   Minimum side and rear yards. Minimum side and rear yards may include interior access driveways connecting to adjoining lots provided that the remainder of said yards shall be maintained as open space free from buildings or structures in compliance with the requirements for perimeter landscape yards as set forth in Article IV; and
         (c)   Minimum side and rear bufferyards. Shall be landscaped with grass and shrubbery, trees or hedge, or in combination with other suitable ground cover materials and maintained in compliance with the requirements for perimeter landscape yards as set forth in Article IV.
      (4)   Maximum building height. 75 feet, provided however, that the setback for that portion of the building or structure which is in excess of 35 feet shall be increased by one foot each one foot of building or structural height above 35 feet until the ultimate height of 75 feet is allowed.
      (5)   Parking and loading. See Article IV.
      (6)   Signs. See Article VII.
      (7)   Outside storage and operations.
         (a)   Operations. All operations, servicing and processing located within 600 feet of either a residential district boundary or Gateway Corridor (except outside storage, off-street parking and off-street loading) shall be conducted within completely enclosed buildings.
         (b)   Storage. All storage of materials or products within 600 feet of a residential district boundary or Gateway Corridor shall be either:
            1.   Within completely enclosed buildings; or
            2.   Effectively screened within a chain link, lattice or similar type fenced area, with ornamental, non-solid or chain link gates. The height of said fence shall be at least six feet and shall not exceed eight feet. Materials or products stored within the enclosure shall not exceed the height thereof. The storage area shall be surrounded by landscaping installed in compliance with the provisions of Article IV for Level 3 Perimeter Landscape Requirements.
         (c)   Amount of outside storage and operations. The total area devoted to outside storage and operations shall not exceed 10% of the gross floor area of enclosed structures or buildings on the lot.
      (8)   Landscape requirements. See Article IV.
(Ord. 21-97, passed - -1997; Ord. 3-2000, passed - -2000; Ord. 39-2006, passed 10-9-2006; Ord. 18-2010, passed 11-22-2010; Ord. 04-2013, passed 2-25-2013)