8-2-3: STORM SEWER UTILITY FACILITIES AND COSTS:
   A.   All currently existing storm sewer facilities and associated assets are transferred to the storm sewer utility. In return, the storm sewer utility shall assume the responsibility for planning, designing, constructing, maintaining, administering, and operating the storm sewer system.
   B.   All storm sewer improvements subsequently constructed shall be planned, designed, constructed, maintained, administered, and operated by the storm sewer utility. (Ord. 2003-003, 5-15-2003)