7-3-4: APPLICATION FOR PERMIT; REQUIREMENTS:
   A.   Required; Filing: Application for a permit shall be filed with the city engineer or public works director on a form or forms to be furnished by the city. Property owners and/or tenants for whom work is being done shall be responsible for obtaining the permits; provided however, contractors may obtain the permit in the contractor's name.
   B.   Eligible Persons: No person shall be eligible to apply for or receive permits to do work within the public ways of the city, save and except the following:
      1.   Contractors licensed by the state as general contractors;
      2.   Providers;
      3.   Property owners installing, replacing or maintaining less than five hundred (500) square feet or one hundred (100) linear feet of sidewalk, curb and gutter, or driveway approach, or other work approved by the city engineer, upon a portion of the public way adjacent to their residence; or
      4.   Persons offering a service which requires occupation of the public way, such as scaffold or staging, staging of a crane, installation or maintenance of electric signs, glass, awnings and painting or cleaning of buildings or sign boards or other structures.
   C.   Denial Based On Past Performances: The city engineer may deny the issuance of permits to contractors, utility companies or other permit applicants who have shown by past performance that, in the opinion of the city engineer, they will not consistently conform to the engineering regulations, specifications, design standards or the requirements of this chapter.
   D.   Engineering Plans; When Required: When necessary, in the judgment of the city engineer, to fully determine the relationship of the work proposed to existing or proposed facilities within the public ways, or to determine whether the work proposed complies with the engineering regulations, construction specifications and design standards, the city engineer may require the filing of engineering plans, specifications and sketches showing the proposed work in sufficient detail to permit determination of such relationship or compliance, or both, and the application shall be deemed suspended until such plans and sketches are filed and approved.
   E.   Approval Required Prior To Commencement Of Work: It shall be unlawful for any person to commence work upon any public way until the city engineer has approved the application and until a permit has been issued for such work, except as specifically approved to the contrary in this chapter.
   F.   Government Employees: It shall be lawful for a city, county, state, federal or other government employee to perform routine maintenance work, not involving excavations, without first having obtained a permit therefor.
   G.   Hand Digging Excavations: A permit is not required from the city engineer for hand digging excavations for installation or repair of sprinkler systems and landscaping within the nonpaved areas of the public way. However, conformance to all city specifications is required. (Ord. 2000-06, 5-4-2000, eff. 5-4-2000; amd. Ord. 2020-10, 10-15-2020)