1135.04 FEES.
   The following fees shall be imposed and required for the indicated zoning services:
(a)
Zoning Permits
 
(1)
Single family residence
$130.00
 
(2)
Twin single residence
$260.00
 
(3)
Apartments, multi-family housing units and townhouses
$400.00 plus $25.00 per unit for units in excess of three (3)
 
(4)
Garages - 1 car
$70.00
 
(5)
Garages - 2 car
$70.00
 
(6)
Garages over 2 car
$130.00
 
(7)
Carports - under 24' x 24'
$100.00
 
(8)
Carports - 24' x 24' and over
$130.00
 
(9)
Small storage building (100 sq. ft. or less)
$25.00
 
(10)
Storage buildings up to 24' x 24' (576 sq. ft.)
$70.00
 
(11)
Storage buildings larger than 576 sq. ft.
$130.00
 
(12)
Deck, open porch or stoop
$70.00
 
(13)
New construction, commercial and industrial
$400,00 plus 10.00 per 1000 sq. ft.
 
(14)
Structure change or exterior addition to dwelling
$100.00
 
(15)
Swimming pool
$70.00
 
(16)
Structure change or addition to commercial or industrial buildings
$400.00 plus $10.00 per 1000 sq. ft.
 
(17)
Wellhead Protection District
$200.00 plus engineering fees and testing expenses
(b)
Temporary Zoning Permit
 
 
- Residential
$70.00
 
 
- Commercial
$200.00
 
 
- Industrial
$200.00 plus $5.00 per 1,000 sq. ft.
 
(c)
Signs Permits
 
(1)
Permanent sign
$2.00 per square foot up to a maximum of $100.00 with a $25.00 minimum
 
(2)
Temporary sign
$50.00
(d)
Home Occupation Permit
$50.00
(e)
Rezoning Application
$660.00 plus $25.00 per acre or portion thereof over one acre
(f)
Appeal Request
 
(1)
Appeal from BZA Decision
$300.00
 
(2)
Appeal from violation of Zoning Ordinance
$30.00
(g)
Area Variance Request
$300.00 per lot
(h)
Conditional Use Permit Request
$300.00
(i)
Special Permit Request
 
(1)
Communication tower
$660.00 plus cost of review by Village Engineer, legal counsel or other outside services
 
(2)
Portable structure and temporary use
$130.00
 
(3)
Model home
$260.00
(j)
Site Plans
 
(1)
Minor site plan review
$250.00 plus cost of review by Village Engineer when applicable
 
(2)
Major site plan review
$500.00 plus cost of review by Village Engineer, legal counsel or other outside services, when applicable
 
(k)
Planned Districts
(1)
Planned district development plan review
$1500 for 20 acres or less plus $50 per acre or portion thereof over 20 acres plus cost of review by the Village Engineer, legal counsel or other outside services, when applicable.
 
(2)
Planned district final development plan minor revision review
$750.00
 
(3)
Time extension request
$750.00
(l)
Fence permit
 
(1)
Residential
$50.00
 
(2)
Commercial or industrial
$100.00
(m)
Flood plain development review
$1,000
(n)
Erosion, sedimentation and stormwater control plan
$125.00 for sites disturbing less than five acres; $250.00 for sites disturbing five acres or more plus any additional costs incurred for review by the Village Engineer or inspecting agency, when applicable
(o)
Park fees
 
(1)
Residential
$500.00 per dwelling unit
 
(2)
Commercial, office, industrial or other business use
$1,500 for each acre of such lot or parcel
(p)
Miscellaneous
 
(1)
Subdivision Regulations & Zoning Ordinance - 1 copy
$30.00
 
(2)
Development CD (contains zoning ordinance and subdivision regulations)
$15.00
 
(3)
Returned check fee
$35.00
 
(4)
Application to close alley
$300.00 plus $50.00 per adjoining property
 
(5)
Tree Removal Permit
$15.00 (1189.02(c))
 
(6)
Alternative Energy Permit
$100.00
(q)
Subsivision without plat
$150.00
 
   NOTE: If the cost incurred by the Village, including legal, civil engineering or other outside services, exceed the fees stated above, the additional costs must be paid by the applicant.
(Ord. 25-08. Passed 2-25-28; Ord. 13-11. Passed 10-24-11; Ord. 8-12. Passed 6-25-12; Ord. 1-16. Passed 3-28-16; Ord. 12-16. Passed 10-24-16.)