8-7-49: GROUND PREPARATION FOR FILL PLACEMENT:
The natural ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, top soil, and other unsuitable material, and where slopes are five (5) horizontal to one vertical or steeper, by benching into competent material in a manner acceptable to the city engineer. The keyway under the toe, if specified, shall be at least ten feet (10') wide. (Ord. 1523, 4-11-1995)