Where soil or geologic conditions encountered in the grading operation deviate from that anticipated in the soil and geologic study reports or where such conditions warrant changes to the recommendations contained in the original soil studies, a revised soil or geologic report shall be submitted for the approval of the city engineer. (Ord. 1523, 4-11-1995)