8-7-34: FINAL REPORT:
Upon completion of rough grading work, the city engineer may require a final geotechnical report that includes, but is not necessarily limited to, the following:
   (A)   A complete record of all field and laboratory tests including location and elevation of all field tests.
   (B)   A professional opinion regarding slope stability, soil bearing capacity, and any other pertinent information.
   (C)   Recommendations regarding foundation and roadway design, including soil bearing potential, and building restrictions or setbacks from the top or toe of slopes.
   (D)   A declaration by the geotechnical engineer or civil engineer competent to do so or engineering geologist in the format required by the city engineer that all work was done in substantial accordance with the recommendations contained in the soil or geologic study reports as approved and in accordance with the approved plans and specifications. (Ord. 1523, 4-11-1995)