CHAPTER 7
GRADING, EROSION AND SEDIMENT CONTROL
SECTION:
8-7-1: Title
8-7-2: Purpose
8-7-3: Scope
8-7-4: Definitions
8-7-5: General Requirements; Grading Permit Required
8-7-6: Exemptions
8-7-7: General Requirements For Grading
8-7-8: Water Obstruction
8-7-9: Construction In Public Rights Of Way
8-7-10: Hazards
8-7-11: Administration
8-7-12: Application Procedure
8-7-13: Compliance With CEQA
8-7-14: Referral To Other Public Agencies
8-7-15: Permit Conditions
8-7-16: Permission Of Other Agencies Or Owners
8-7-17: Location Of Property Lines
8-7-18: Time Limits
8-7-19: Validity
8-7-20: Appeals
8-7-21: Applications, Plans And Specifications
8-7-22: Preliminary Grading Plans
8-7-23: Final Grading Plans; Engineer Required
8-7-24: Final Grading Plans; Engineer Not Required
8-7-25: Modification Of Approved Plans
8-7-26: Seasonal Requirements
8-7-27: Distribution And Use Of Approved Plans
8-7-28: General Permit Requirements
8-7-29: Fees
8-7-30: Geotechnical Study Required
8-7-31: Studies
8-7-32: Reports; General
8-7-33: Soil/Geologic Study Report
8-7-34: Final Report
8-7-35: Changed Conditions
8-7-36: Special Inspection
8-7-37: Noncompliance Notification By Geotechnical Engineer Or Civil Engineer Competent To Do So
8-7-38: Periodic Progress Reports By Private Geotechnical Engineer Or Civil Engineer Competent To Do So
8-7-39: Progress Report By Permittee
8-7-40: Submit As Built Plans
8-7-41: Performance Of Work; Inspection
8-7-42: Other Responsibilities Of Permittee
8-7-43: Transfer Of Permit
8-7-44: Design And Review For Mass Pad Grading
8-7-45: Excavation
8-7-46: Excavation Slope
8-7-47: Fill Placement
8-7-48: Fill Compaction
8-7-49: Ground Preparation For Fill Placement
8-7-50: Fill Slopes
8-7-51: Slope Fencing
8-7-52: Adjacent Structures Protection
8-7-53: Setbacks
8-7-54: Drainage; General
8-7-55: Drainage; Disposal Requirements
8-7-56: Drainage; Water Accumulation
8-7-57: Drainage Protection Of Adjoining Property
8-7-58: Drainage Control
8-7-59: Subsurface Drainage
8-7-60: Erosion And Sediment Control
8-7-61: Emergency Conditions
8-7-62: Erosion And Sediment Control Plans
8-7-63: Vehicular Ways; General
8-7-64: Vehicular Ways; Drainage
8-7-65: Security Required
8-7-66: Enforcement, Suspension And Revocation Of Permit
8-7-67: Corrective Work
8-7-68: Misdemeanor Violation
8-7-69: Nonexclusive Remedies
8-7-70: Enforcement Official
8-7-71: Right Of Entry
8-7-72: Stop Work Orders
8-7-73: Liability
8-7-74: Denial Of Other Permits And Inspections
8-7-75: Severability