7-14-10: TEMPORARY CONSTRUCTION CONNECTIONS:
Temporary construction connections to city water mains used for the purpose of testing and flushing noncity water lines shall be protected with a minimum of an RP. They shall be installed in accordance with El Dorado irrigation district's current design and construction standards and shall be inspected and certified by the city utility services technician prior to use and annually thereafter until completion of project. Failure to contact city in a timely manner for annual certification may result in termination of connection to city water main. Each RP must also be retested by the city upon relocation. (Ord. 1661, 2-25-2014)