7-14-9: TEMPORARY METER CONNECTION:
Temporary meter connections to city hydrants, blow offs, or other city infrastructure shall be protected with a minimum of an RP. The temporary meter and RP shall be installed by the city upon customer submittal of appropriate request form and accompanying deposit to the city. The location of the installed temporary meter connection shall be determined by the city in its sole discretion following review of request form. Customer shall access water at approved location through city installed gate valve located downstream of RP. Under no circumstances shall customer operate hydrant, blow off, or other city infrastructure. (Ord. 1661, 2-25-2014)